Building a Custom Home in Portofino in Clayton...A Diary, Day 10

Building a Custom Home in Portofino in Clayton...A Diary, Day 10Lot 31 Portofino, Clayton, NC 27527

 

 

 

 

OK so the concrete is poured and has been allowed to set, the next phase is to remove the frames, which is done after a few days. The re-bar on the footing is pushed down and will be encased in the concrete that will be poured for the floor.

 

Lot 31 Portofino, Clayton, NC 27527

 

 

 

 

 

 

 

 

 

The house at Lot 31 will have a walk out basement and patio so the walls were only poured on three sides.The basement will have a bedroom, a full bathroom, office and large den. Building a Custom Built Home in Portofino in Clayton is a great experience as this team of builders are the very best custom builders in the Triangle. They have a level of professionalism you won't find every day.

 

 

After the walls have set they need to be waterproofed before the dirt is pushed back up against them. The walls are painted with a water repellent and then a water proof backing is applied.There is also a drain and pipe to channel the moisture away from the walls.

Here are the links to the stages up to this point.

 A Diary of Building a Custom Home in Portofino in Clayton, Day 1

A Diary of Building a Custom Home in Portofino in Clayton, Day 2 & 3

A Diary of Building a Custom Home in Portofino in Clayton, Day 6 & 7

 

 

I would like to help you sell your house, or help you buy a house.

Call me at  (919) 601-2268

          or email odohertyd@hpw.com                          

Subscribe to my blog for information about the Triangle

The information in this Blog is presumed accurate but is not guaranteed.

Do not copy without permission.

Protected by Copyscape Web Plagiarism Test

 

Building a Custom Home in Portofino in Clayton...A Diary,Day 2 and 3

Building a Custom Home in Portofino in Clayton...A Diary,Day 2 and 3

Alright so the lot has been excavated and now it is time to frame the footers, very important. Every thing is important here but this is a big heavy house so the footings need to be right.

Lot 31 Portofino, Clayton, NC

This home is also going to have a large basement, once the re-bar is in and the frames are set, the following day they brought in the cement trucks and the pump truck.

Lot 31 Portofino, Clayton, NC

The cement is dumped into a big tank at the back of the pump truck and then the boom operator positions the opening over the frames and starts the cement flowing.

Lot 31 Portofino, Clayton, NC

 

 

 

 

I would like to help you sell your house, or help you buy a house.

Call me at  (919) 601-2268

          or email odohertyd@hpw.com                          

Subscribe to my blog for information about the Triangle

The information in this Blog is presumed accurate but is not guaranteed.

Do not copy without permission.

Protected by Copyscape Web Plagiarism Test